Aşgabat
News
20
In Ahal velayat, a ceremonial commissioning took place for a water treatment facility with a capacity of 30,000 cubic meters of drinking water per day in the city of Tejen and a wastewater treatment facility with a capacity of 15,000 cubic meters per day in Ak Bugday etrap.
The water treatment facility in Tejen was constructed by the private enterprise “Netijeli Binýat”, and the wastewater treatment facility in Ak Bugday etrap was built by “Mukaddes Toprak”. Participants of the event noted that these facilities are tangible results of the policies of the esteemed President Serdar Berdimuhamedov, aimed at improving the well-being of the people.
The equipment at these facilities is the most modern, sourced from top global manufacturers. All technological processes at the water facilities are computerized, allowing specialists to monitor and set parameters for the "smart" equipment, ensuring its uninterrupted operation.
The high-quality laboratory equipment, filters, control and measuring instruments, and other technical tools installed at these hydrotechnical facilities enable the purification and disinfection of incoming water and wastewater, bringing them to the required standards.
Source: “Neutral Turkmenistan” newspaper
744000, Turkmenistan, Ashgabat city, Baktyarlyk etrap, Magtymguly avenue, 136 house
Takyk ulgam. All rights reserved. 2024